Kyle M. LeClair · Independent Research · January 2026

The conformal-coating and PCCA cleaning cell brings two manufacturing decisions into the same room. When is a printed circuit card assembly (PCCA) clean and dry enough to coat? Once the coating has cured, what evidence supports releasing the hardware? I developed the facility plan and examined both questions in the accompanying study, from the residue beneath a component to the records a supplier delivers with a finished assembly.

The conformal-coating and PCCA cleaning cell

Elevated cutaway view of the facility concept, showing the conformal-coating and PCCA cleaning cell, adjacent mechanical wash bay, and service equipment.
Interactive CAD visualization of the conformal-coating and PCCA cleaning cell and adjacent mechanical wash bay. Rotate, pan, and zoom to examine the arrangement; translucent enclosure walls preserve spatial context.

From equipment footprint to working space

The hood, rinse basin, and ultrasonic station occupy one side of the cell. The worktables and drying oven face them. The neighboring bay serves a separate mechanical-parts washing operation. The distinction matters when following an assembly through the model. A cleaned card needs a protected route to drying, cooling, and coating, even while another operator handles incoming work or used cleaning liquid.

I used the located faces of the CAD assembly to measure the cell. Its interior wall planes enclose a rectangle 3.4036 m by 2.4384 m, or 8.299 m². At one overlap between the wet-process stations and the opposing tables, the modeled fixtures are approximately 0.926 m apart. That dimension describes a particular cross-section. Assessing working clearance also requires the path of an open door or extended rack, the position of the operator carrying a loaded fixture, and the space needed to remove equipment for service.

Rotate the model toward the outside wall to find the deionized-water vessels, then follow the hood exhaust above the work surfaces. Equipment that sits outside the cell still consumes service space and needs a route for maintenance. Water quality also has to be assessed where the rinse reaches the workpiece. The physical layout and the process specification meet at that point. Figure 6 on page 35 identifies the equipment and shows the overhead and under-bench services together.

Preparing the surface that the coating will seal

The cleaning history begins during soldering and rework. By the time a card reaches final preparation, its flux may have experienced multiple heat cycles, and residue can remain under low-standoff packages where neither a brush nor a direct line of sight reaches it. I treated bench cleaning and final preparation as separate operations. The incoming record carries the flux, cleaning method, and prior exposure forward so the final process can account for the condition of the actual assembly.

Method selection depends on the residue, the access available to the cleaning liquid, and the restrictions of the installed components. A successful trial on a flat coupon answers only part of that question. A representative test article also needs the package spacing, soldering history, and rinse and drainage paths that make the production card difficult to clean. The study follows the used wash liquid and final rinse separately. Liquid can remove residue from one surface and deposit it on another as it drains or evaporates.

I selected complementary measurements for different kinds of evidence. A resistivity-of-solvent-extract test (ROSE) can reveal a change in bulk extractable ionic contamination. Ion chromatography identifies selected ions in the extract, with the sampling area and extraction method recorded so results can be compared. Surface insulation resistance under humidity and electrical bias measures how well a representative surface continues to isolate neighboring conductors. Together these methods connect a cleaning-process change to a chemical observation and an electrical response. The paper compares the methods on pages 14–15.

Bakeout, cooling, and transfer

An oven controller records the chamber setpoint. The relevant thermal history belongs to the assembly. The qualification plan follows representative locations in a loaded oven to establish when the required dwell begins and how much exposure the most temperature-sensitive component receives. The plan also accounts for what happens when the door opens. A clean receiving fixture, protected cooling location, and recorded takeout time preserve the surface condition through masking and coating. If the permitted exposure window expires, the traveler identifies the required disposition before the card proceeds.

Coating application and defect diagnosis

The coating drawing sets functional boundaries on both faces of the assembly. Connector mating surfaces, grounding contacts, component vents, and thermal interfaces have different reasons to remain clear. The application method must reach specified surfaces while preserving those functions. I connected each boundary to a point in the process where an inspector can still see it, from mask placement before application to the film edge exposed during demasking.

A dry-film requirement also has consequences at the applicator. In the paper’s worked example, a 50 µm dry target with a coating at 40% solids by volume corresponds to a nominal 125 µm wet film. A witness coupon provides an accessible measurement surface. Its position must represent the deposition at the board location of interest. Around a component body, pooling, shadowing, and edge thinning can produce a different result. Fluorescence can help locate a coverage gap, while thickness and cure require their own evidence.

For defect diagnosis, the time of first appearance can be more informative than the final photograph. Bubbles already present in the reservoir direct attention to mixing and material handling. Bubbles first visible during cure point the investigation toward retained volatiles, substrate outgassing, or locally heavy deposition. Recording when and where the defect appears gives the next process trial a specific cause to test. The inspection discussion begins on page 22.

Qualification and release decisions

I developed a screening protocol around the interaction of cleaning concentration, temperature, and exposure time. Two levels of each produce eight combinations. Three independent runs at each of two residue-aging conditions give 48 planned process cases before controls. Repeated readings from one coupon characterize variation in measurement. Separately processed specimens also capture variation introduced by the process itself. The paper defines the experiment and the evidence needed to confirm an operating range. The screening design is on page 42.

The manufacturing record supports three decisions. Before coating, it identifies the cleanliness and drying evidence, the remaining handling window, and the verified masking configuration. After application, it links the material lot and witness coupon to the actual cure conditions, including any secondary cure. Final release brings coverage, keepouts, thickness evidence, repair disposition, functional tests, and packaging together against the applicable product requirements.

I also examined whether the planned sequence could sustain production. In one illustrative capacity calculation, a 12-assembly load, two-hour dwell, 15 minutes of handling, and 85% availability yield 4.53 assemblies per hour. At a demand of six per hour, increasing the coating rate would send work to the oven faster than the oven could clear it. That result directs attention to qualified batch size, parallel capacity, scheduling, and protected holding space. These are planning assumptions. Actual capacity depends on the qualified load and measured operating conditions.

Supplier requirements and acceptance criteria

At Mirion, I translated assembly requirements into a supplier-facing conformal-coating specification. I defined material identification and traceability, required preparation, restricted coating regions, cure, inspection, and acceptance evidence. That gave qualified suppliers room to select an appropriate application method while giving receiving inspection a consistent basis for accepting delivered hardware. The independent paper develops the engineering behind those decisions, including how a change in flux, coating, fixture, or cure profile affects the evidence needed for release.

Research paper

Section 8 brings the process sequence into the facility model. Appendix E gives the assumptions and calculations behind equipment clearance, exhaust and makeup air, thermal load, and curing capacity.

Open the original PDF · 62 pages

of 62

Loading reader…

PCBA Cleaning and Conformal Coating: Process Qualification and Compact Facility Design, page 1. Use Text view for the page transcript.